Construction Unit: Henan Rongji Real Estate Co., Ltd. Postal address: Zhengzhou, Henan Province Postal Code: 450000 Ethylene Cracking Furnace Anchor Anchors are mostly used as fixtures for integral linings (castable, plastic and sprayable linings). Refractory brick linings also use anchors, but they are not used in many occasions. Metal anchors are usually used to support and fix thin or heat-insulating integral linings, such as chimney linings, wear-resistant linings of petrochemical catalytic cracking reactors (usually tortoise shell mesh anchors), integral jet metallurgy The lining of the spray gun, the overall lining of the immersion pipe of the DH and RH vacuum degassing devices, the lining of the rotary kiln discharge day, the feeding port, etc. Metal anchors are mostly used to fix linings with a long-term use temperature below 1200 °C, or short-term use temperature above 1200 °C that can be used intermittently. Ceramic anchors are usually used to fix thicker (greater than 200mm) integral linings and are characterized by: Ethylene Cracking Furnace Anchor,Corbel Anchor,601 Inconel Refractory Anchor,310 Stainless Steel Refractory Anchor Puyu kiln technology (jiangsu) CO.,LTD , https://www.anchorpy.com
Project Introduction:
The project is located at the southeast corner of the intersection of Wulong Road and Jiefang Road in Lingbao City with a total construction area of ​​approximately 196446.80 square meters; underground construction area of ​​approximately 33488.0 square meters, and above-ground construction area of ​​approximately 162958.80 square meters (residential construction area of ​​approximately 14,4086.0 square meters, commercial construction With an area of ​​approximately 1,7488.0 square meters and a club building area of ​​approximately 1384.8 square meters), it is proposed to construct 7 residential buildings, which will be developed and constructed in two phases. The first phase will include the development and construction of 2 commercial and residential buildings and 3 residential buildings with an area of ​​approximately 8,7446.8 square meters. The second phase of development and construction of two commercial and residential buildings, an area of ​​about 75512.0 square meters. The plot ratio is 3.5, the building density is 25%, and the green space rate is 30%.
Total project investment: 150 million yuan.
Phone, 62907777
(1) It can withstand higher operating temperatures, and is generally used in the lining of kilns that are used for a long time above 1200 °C;
(2) It can withstand the erosion and corrosion of corrosive atmosphere;
(3) It can be extended to the working surface to reduce the peeling of the overall lining;
(4) Compared with metal anchors, the contact area with the refractory lining is large, so it has a greater supporting capacity;
(5) The thermal expansion coefficient is equivalent to that of the overall refractory material, which can eliminate the cracking or peeling of the lining due to thermal expansion mismatch
Lingbao City Rongji Hongrun City Project
Project Name: Lingji Hongji City, Lingbao City Progress of the project: Filing construction period: 2011-2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities, and cranes.
Related Developments: Tower Crane Infrastructure Project