In order to better serve Liugong equipment on the China-Laos Railway, on July 18, 2017, Liugong Asia-Pacific Company and local distributors in Laos formed a “scrutiny unit†and began the inspection of Liugong equipment along the railway line. After the brief launching ceremony, the "scrutiny unit" drove the service vehicles to the front line of the railway. At the construction site, the “scrutiny unit†not only conducted a careful inspection of the equipment, but also had detailed conversations with the customer and operator regarding the use of the equipment and made suggestions for the operation and maintenance of the equipment. Received praise from users and operators. As the local Laos is now in the rainy season and a light rain began in the afternoon, this did not affect the development of the inspection work. The inspection team continued to inspect the equipment with rain. This is a manifestation of the "customer orientation" spirit of Liu workers. With the continuous development of railway projects, LiuGong Asia-Pacific and Laos local dealers continue to intensify cooperation with railway project departments and provide high-quality, reliable after-market services to provide strong support for the construction of China-Laos Railway. (This article is from Liugong) Aluminum Embossed Sheet widely use in refrigerator, solar heat reflectors, decorative aluminum products, lamps, disinfection box, air conditioning, ventilation ducts, outdoor and indoor decoration, machinery and equipment housing and other industries. This provides the surface which diffuses light reducing reflectivity and glare. It produced by embossing rollers. Embossed Aluminium Sheet,Embossed Aluminum plate,Perforated Aluminum Sheet, Aluminium Checkered Plate Trumony Aluminum Limited , https://www.szaluminumcoil.com
Liugong equipment inspection team took over the rain to repair the railway construction
Liugong equipment inspection
Inspection site
Supporting the construction of railways in China and Laos
Liugong equipment inspection team took care of the rain and built the old railway construction
Since the middle and old railways started, Liugong equipment has entered the construction site one after another. Tunnels, mixing stations, quarries, etc.. All the working conditions on the railway can be seen in Liugong equipment.
Related News: Liugong Service Inspection