EVA Puzzle Mat is always a classic and
necessary educational toys for baby or children.
Made from Eco-friendly, closed cell,
non-smell and non-toxic EVA foam material, Melors promises that the foam puzzle mat
we offer is no harm to baby or children even many people is worry about the
safe of EVA foam product. We have passed ASTM and EN71 certificates for our EVA play mat, the certificates are available if customers need to have a look.
We have multiple educational puzzle mat designs like
numbers, letters, animals and vehicles for options, these are the basic and
common factors in the life, which is very good for the pre-school education for
baby and children, also as a safe and comfortable baby play mat applied in house.
If customer is interested in customized
design of the baby puzzle mat, please also feel free to let us know, we are capable to
produce the puzzle mat based on customized design, even the puzzle mat with a
full printing.
Eva Puzzle Mat,Baby Puzzle Mat,Eva Kids Puzzle Mat,Puzzle Floor Mat,Eva Jigsaw Mat,Educational Puzzle Mat Huizhou City Melors Plastic Products Co., Limited , https://www.melorsfloor.com
First, the necessary prerequisite is: a professional inspection of the slurry pump seal in advance:
1, check the installation of the mechanical seal models, specifications are correct.
2, check the size of the slurry pump and mechanical seal installation site dimensions related to the accuracy and interrelationship with the technical requirements. Mainly in the following areas:
(1) Allowable radial runout of the shaft (or sleeve) where the mechanical seal is installed, surface finish of the shaft (or sleeve) and tolerance of outside diameter dimensions.
(2) seal cavity and gland positioning end face of the shaft (or sleeve) centerline vertical tolerance tolerance.
(3) The end of the shaft (or sleeve) on which the moving ring seal is mounted, and the chamfer and finish of the end structure of the housing bore for the mechanical seal.
(4) The axial displacement of the mechanical seal shaft when working.
(5) During the installation of the mechanical seal, it should be kept clean, and the sealing element should not be knocked by the tool to prevent damage and destruction.
Second, the correct operation of the installation of slurry pump:
1, the installation, moving, static ring surface should be coated with a layer of clean oil and turbine oil. Auxiliary seals (including moving ring seals and static ring seals) are also to be applied with a clean layer of engine oil or turbine oil before installation to ensure smooth installation.
2, the static ring seal set behind the static ring, into the sealed end cap, pay attention not to hurt the static end face, to ensure that the static end face and cover the centerline vertical, and pay attention to the back of the static ring to prevent trough to Alignment anti-sales, but can not touch.
3, the rotating part of the mechanical seal, relying on the spring seat on the two fixed screws and the shaft fixed, tighten the screws, to ensure the working length of the spring. The use of slurry pump mechanical seal Third, the use of the first start Note:
1, before starting the slurry pump, check the mechanical seal attached device, cooling lubrication system is perfect and smooth.
2, before starting the material line should be cleaned to prevent rust impurities into the sealed chamber.
3, hand drive coupling, check the shaft is easy to rotate, if the drive is heavy, need to check the installation dimensions are correct.
4, the normal drive, the need for static pressure test, check the mechanical seal face, seal ring and seal at the end of the sealing effect, if there is a problem, one by one to check and solve.
5, slurry pump start, should keep the sealed chamber filled with liquid or sealed medium, if a separate sealing system should be started, the cooling water system must also begin to flow.
6, before normal use, the first atmospheric pressure operation, observe the sealed parts of the temperature rise is normal, whether the phenomenon of leakage. If there is a slight leakage, you can run together for some time, so that the face fit more evenly, until the leakage gradually reduced to normal so far. Such as running 1-3 hours, the amount of leakage is still not reduced, you need to stop inspection.
7, under normal working conditions, step-up heating can be slow, respectively, and pay attention to the end of the temperature rise and leakage, such as all normal, that can be put into production.
Details of the slurry pump mechanical seal installation
Details of the slurry pump equipment sealing and installation: